Service

High-Rise Intercom Installation — Brisbane & Gold Coast

Towers introduce complexity that low-rise installs never see: long riser runs, lift integration requirements, multiple lobbies, and resident counts that demand cloud-scale admin tools. We specialise.

What's included

  • 100+ unit experienceBuildings of 100, 200, or 300+ units require different equipment, different network architecture, and different commissioning processes. We've done it.
  • Multi-lobby coordinationMost towers have main lobby, service lobby, basement entry, and pool/amenity entries. All must be coordinated, all must work together.
  • Lift integrationFloor restriction by credential, lift call from intercom, emergency override — we integrate with KONE, Otis, Schindler, Thyssenkrupp.
  • Backbone IP architectureTowers need genuine IP backbone with managed switches, PoE budgets, and redundancy. We design network as carefully as we design intercoms.
  • BMS and smart-building integrationModern towers integrate intercom with building management systems, lighting, HVAC, and CCTV. We deliver coordinated install plans.

Request a quote →   Request a Quote →

High-Rise Intercom Installation
Why High-Rise Owners Choose Us

Built for buildings, not just doorbells.

Generalist installers do houses. We do towers. Every quote, every install, every service contract is built around how apartment buildings actually work.

High-rise specialism

We design only for apartments, mixed-use towers, and strata-managed buildings. We know the wiring, the riser cupboards, the lift integrations, the BMS handshakes.

4-hour response SLA

Maintenance contract holders get same-business-day attendance for critical faults. No "we'll get to it next week" — your residents are at the door.

Akuvox specialist depth

We install Akuvox exclusively — R20A-2, X912S, S563, EC33, X915 series. Specialist depth beats multi-brand breadth: deeper certifications, faster installs, predictable parts.

Smartphone-first design

Every system we install supports resident smartphone access — answer the door from work, the gym, or holiday. No more handsets that go obsolete in 5 years.

Strata-ready paperwork

Certificates of Currency, scope-of-works docs, AGM-ready quotes. We arrive at your committee meeting with paperwork your strata manager can sign.

Tenant turnover service

Productised reprogramming as residents change. Annual contracts so you don't get a $400 bill every time someone moves in.

FAQs

Common questions

What's the largest building you've worked on?
Within our specialty range, 200+ unit towers across Brisbane CBD and the Gold Coast strip. We staff and equip for buildings up to 400 units.
Do you handle commissioning and certification?
Yes — full commissioning, certification, and as-built documentation. We provide handover packs that satisfy strata, body corporate, and developer requirements.
Can you work alongside other contractors during construction?
Yes — we work to the head contractor's program, attend coordination meetings, and document hand-offs at every stage.
Related services

Other services strata managers ask about

New Intercom Installation

New construction intercoms are not the place to cut corners. The system you specify at design stage will outlive the carpet, the lifts, and …

Read more

Intercom Lift Integration

In a 30-storey tower, the lift is the second front door. Visitor calls should only allow access to the resident's floor. Tradies should only…

Read more

IP Intercom Systems

IP intercoms are not just intercoms with network ports — they're a different architectural approach. Every device is independently addressab…

Read more

Get a high-rise intercom quote in 24 hours.

Same-week site survey across Brisbane & the Gold Coast. No obligation, no pushy follow-ups.

Request Site Survey   Request a Quote →